Studio KallioArchitects · Helsinki

Renovation · Helsinki harbour area

Tiilivarasto: a 1920s brick warehouse turned into workshops

A long brick warehouse by the harbour, empty for years, now holds twelve small workshops and a shared hall. The brick shell stays; everything new is steel, glass and perforated metal, easy to tell apart.

Project
SK-019
Type
Renovation, change of use
Location
Helsinki harbour area
Gross area
1,680 m²
Units
12 workshops of 30–40 m²
Completed
2023
Client
Property company
Our role
Survey, change-of-use permit, design, site

Step through with the arrow buttons, the ← and → keys or a swipe. Esc closes full screen.

Site plan with the hatched warehouse by a harbour basin, the new stair tower and canopy in black and the site boundary in orange
01 Site plan · 1:1000The warehouse (hatched) between the quay road and the older industrial blocks, with the new stair tower and canopy in black and the yard dotted.
Plan of the warehouse with hatched existing brick walls, twelve workshop units along a corridor, the shared hall and the new stair tower
02 Ground floor plan · 1:2001 Workshop, one of twelve, 2 Corridor, 3 Shared hall, 4 Kitchenette with a mezzanine above, 5 New stair and lift tower, 6 Yard. Existing brick walls are hatched, new walls are black.
Section through the brick warehouse with thick walls, timber roof trusses, a steel mezzanine, a roof light and level markers
03 Section C–C · 1:100Through the shared hall: 640 mm brick walls, the repaired timber trusses, the new steel mezzanine and a roof light. The new floor slab sits on the old foundations.
Axonometric of the brick warehouse with ten roof lights, a canopy and the perforated metal stair tower
04 AxonometricFrom the south: the brick facade with its original openings, ten new roof lights, the canopy over the hall doors and the stair tower in perforated metal.

The building

The warehouse was built in the 1920s to store goods from the harbour. It has solid brick walls up to 640 mm thick and timber roof trusses spanning sixteen metres. The street facade is protected in the local detailed plan.

A change of use

Turning storage into workplaces needed a change-of-use permit, fire compartments, accessible routes and a second exit from the upper level. We put the new stair and lift in a tower outside the brick shell, so the old walls needed no new holes for them.

Twelve workshops and one hall

The units, 30 to 40 m² each, line a central corridor. The middle bay became a shared hall with the two large doors to the yard, a kitchenette and a small mezzanine for meetings.

Old and new, easy to tell apart

The brick was cleaned and repointed with lime mortar, and damaged trusses were repaired rather than replaced. New parts are steel, glass and perforated metal, bolted rather than built in, so a later owner can change them without touching the original fabric.

What we delivered

  • Building survey and condition report with a structural engineer
  • Change-of-use permit and talks with the city’s heritage experts
  • Construction drawings for the new tower, mezzanine and units
  • Site supervision during the renovation

Next project

024 Kolme pihaa

An old building waiting for a new use?

Start with a survey. Send us photos, the address area and what you would like to do with it.